Archives

Transportation

Scott Shenk writes about transportation issues affecting Fredericksburg-area residents.

Share
RSS feed of this blog

Traffic shift set for U.S. 1 at Aquia Creek bridge

MORE: See all local transportation news

On Friday and Saturday, there will be a traffic shift on U.S. 1 as part of the Aquia Creek bridge replacement project, according to the Virginia Department of Transportation.

Between 9 a.m. and 7 p.m. on Friday, one lane of northbound U.S. 1 will be closed at the bridge location.

During that time, traffic will be shifted to a temporary two-lane bridge.

Between 9 p.m. Friday and noon Saturday, one lane of southbound U.S. 1 will be closed and traffic will be shifted to the northbound lanes.

This new, temporary traffic pattern will remain in place until summer 2014.

The $5.5-million replacement of the 88-year-old bridge started in December 2012 and should be completed in August 2015.

For VDOT’s project details, click here.

Permalink: http://news.fredericksburg.com/transportation/2013/11/07/traffic-shift-set-for-u-s-1-at-aquia-creek-bridge/

Comments guidelines

1. Be respectful. No personal attacks.
2. Please avoid offensive, vulgar, abusive, hateful or defamatory language.
3. Read and follow THE RULES.
4. Please notify us by flagging posts that are inappropriate.

Posts that include links, and posts from users with unverified e-mail addresses may take longer to appear.

*/