Archives

  Spotsy School News

Lindley Estes writes about Spotsylvania County schools, King George County Schools and other issues of interest to the community.

You can also follow her on Twitter @SpotSchoolNews

Share
RSS feed of this blog

Germanna to reopen Dickinson Building and parking deck in January

Germanna Community College is in the process of putting finishing touches on both the restored V. Earl Dickinson Building and a new parking deck at the Fredericksburg Area Campus. Both are slated for use when the spring semester begins on Jan. 7.

The Dickinson Building suffered structural damage from the Aug. 23, 2011 earthquake that centered in adjacent Louisa County.

You can check out today’s story on those issues.

This is the interior of the parking deck. The deck connects to the new science and engineering building via an outdoor but covered walkway.

The new parking deck will have 362 spaces over five levels including the open space on top. Including in that are spaces designated for motorcycles. Between the parking garage and the science and engineering building, the college has also installed bicycle racks.

For safety, the college installed nine emergency phones in the parking garage: two on each level and one outside.

Final touches were being made on the building this week, including work on the elevator.

Students will be able to park in the garage on a first come, first served basis, college spokesman Mike Zitz said. The college will not require students to display stickers for access to the garage.

Post tags:

Permalink: http://news.fredericksburg.com/gettingschooled/2012/12/06/germanna-to-reopen-dickinson-building-and-parking-deck-in-january/

*/